US 7,591,914 B2
High-workability steel pipe and method of producing same
Takaaki Toyooka, Handa (Japan); Yoshikazu Kawabata, Handa (Japan); Akira Yorifuji, Handa (Japan); Masanori Nishimori, Handa (Japan); Motoaki Itadani, Handa (Japan); Takatoshi Okabe, Handa (Japan); and Masatoshi Aratani, Handa (Japan)
Assigned to JFE Steel Corporation, (Japan)
Appl. No. 10/258,982
PCT Filed Jun. 14, 2001, PCT No. PCT/JP01/05053
§ 371(c)(1), (2), (4) Date Oct. 30, 2002,
PCT Pub. No. WO02/103069, PCT Pub. Date Dec. 27, 2002.
Prior Publication US 2003/0145913 A1, Aug. 07, 2003
Int. Cl. C21D 9/08 (2006.01); C22C 38/00 (2006.01)
U.S. Cl. 148—519  [148/320] 12 Claims
OG exemplary drawing
 
1. A method of producing a high-workability steel pipe comprising:
seam-welding strip steel into a steel pipe;
heating the steel pipe to temperatures of more than Ac3; and
immediately or after cooling and reheating said steel pipe, performing diameter-reducing rolling of the steel pipe in a temperature range of from 700° C. to Ac3 with a reduction in diameter of the steel pipe of not less than 30% such that the pipe and a weld in the pipe have an r-value of 1.3 or more.